Skip to main content

Listing broker remarks

Now Introducing Phase 3, the final phase at Sandpiper Place! Rare opportunity to own a new home in the heart of Nantucket, only 2 miles from town and offering easy access to the best Nantucket beaches. This neighborhood will consist of 36 single family homes, with a new amenities center, The Landing, featuring an outdoor heated pool, patio, lounge area, putting area, outdoor California kitchen and grilling center, indoor clubhouse space, fitness center and fire pit. This Atlantic home design features expansive open living, kitchen features an oversized Quartz counter island, high end appliances and finishes, detailed moldings throughout, beautiful modern staircase, first floor office/den, 3 additional bedrooms on second level with 2 full bathrooms, lower level to be finished with additional bathroom and great room with it's own egress. This home also has a patio and a front porch. Delivery in Summer 2026. Developed by Capital Hall Partners. Showings upon request with 24-hour notice.— JD Advisors, Inc

Key details

  • 3,029 sq ft
  • 4,696 lot sq ft
  • 4 beds
  • 4 baths
  • 2026 built
  • $825 / sq ft
  • HOA a
MLS #
7⁠3⁠4⁠3⁠2⁠8⁠6⁠5⁠
Last updated
Address
2 Goldenrod Court
Town
Nantucket, MA
ZIP
02554

Map

Neighborhood: Nantucket

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.