Skip to main content

Listing broker remarks

Inviting ocean breezes in this charming beach front retreat are welcoming you to the sea side community of Nahant! Beach accessible from your back yard patio. Updated kitchen with granite counter tops, SS appliances, LVP flooring and a half bath. Living room with gas fire place, dining room with built in china cabinet. The first floor sunroom over looks the back yard and patio, surrounded in sea roses. Second level with three bedrooms and a huge full bath with jacuzzi tub and shower. Hardwood flooring throughout the two living levels. Updates: exterior remote controlled shutters 2023, kitchen 2021, electric panel 2023, floors refinished 2021, gas fireplace insert 2024, roof 2019, seawall and patio rebuilt, backyard completely fenced in, irrigation system and infinite ocean views!— Century 21 North East

Open Houses

Key details

  • 1,283 sq ft
  • 2,657 lot sq ft
  • 3 beds
  • 1.5 baths
  • 1924 built
  • $747 / sq ft
  • $8,244 2025 taxes
MLS #
7⁠3⁠5⁠0⁠0⁠6⁠3⁠5⁠
Last updated
Address
85 Willow Rd
Town
Nahant, MA
ZIP
01908
Deed (Bk/Pg)
40900 / 476

Map

Neighborhood: Nahant

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.