Skip to main content

Listing broker remarks

BRAND NEW CUSTOM-BUILT COASTAL MASTERPIECE. Nestled in the exclusive oceanfront community of Nahant, this architectural new construction build flawlessly blends designer finishes with professional luxury. Move in for end-of-summer occupancy! The open-concept main level features a show-stopping gourmet kitchen with custom multi-tone Shaker cabinetry, a massive center island, and an expansive walk-in chef’s pantry with wrap-around floating display shelves. Premium appliances include a 36” Monogram 6-burner gas range and seamlessly integrated panel-ready refrigeration. Entertain from the dedicated wet bar with a built-in beverage chiller. Upstairs, the private primary suite is a sanctuary of wellness, complete with a custom spa bath holding dual vanities, a luxury remote bidet seat, and a wireless commercial-grade Mr. Steam shower system. Complete with solid-core Shaker doors, black hardware, an attached 2-car garage, and immediate beach access. Live the seaside dream!— Century 21 Mario Real Estate

Key details

  • 2,506 sq ft
  • 1,013 lot sq ft
  • 4 beds
  • 2.5 baths
  • 2026 built
  • $698 / sq ft
MLS #
7⁠3⁠5⁠3⁠6⁠4⁠0⁠2⁠
Last updated
Address
300 Castle Road
Town
Nahant, MA
ZIP
01908
Deed (Bk/Pg)
29015 / 384

Map

Neighborhood: Nahant

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.