Skip to main content

Listing broker remarks

Builder’s own custom-built home w/detached garage/ADU offering quality, craftsmanship & thoughtful design throughout. This stunning 3,814 sq ft home features 4 bedrooms & 3.5 baths with a spacious, open-concept layout ideal for both everyday living and entertaining. The custom kitchen is the heart of the home, complete with a 36” gas range, walk-in pantry, custom cabinetry w/premium finishes. Rich architectural details include 1st floor Home Office,, custom built-ins & 9’ first-floor ceilings that create an elegant yet comfortable atmosphere.1st & 2nd floor primary suites offer privacy and convenience, while the gas fireplaced living room adds warmth and character to the main living area. Additional highlights include custom blinds, oversized garage bays, and large 2nd floor loft. Step outside to enjoy the covered back porch ,18x20 paver patio overlooking a peaceful private setting on a quiet road.The detached garage/ADU offers an additional 618 sq ft of potential living space.— Barber Real Estate

Key details

  • 3,814 sq ft
  • 40,222 lot sq ft
  • 4 beds
  • 3.5 baths
  • 2025 built
  • $399 / sq ft
MLS #
7⁠3⁠5⁠2⁠0⁠6⁠4⁠8⁠
Last updated
Address
194 Ridge St
Town
Millis, MA
ZIP
02054

Map

Neighborhood: Millis

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.