Skip to main content

Listing broker remarks

Stunning Single-Family home in desirable Middleton. This beautifully maintained 4-bedroom, 3-bath Colonial with updated kitchen and baths, new windows, Septic System installed in 2022/2023, electric updated and new central air installed in 2022/2023 is perfectly situated in one of Middleton's most sought-after neighborhoods. Step inside to find a sun-filled living room, a spacious kitchen and a dinning area ideal for family gatherings. Featuring an open and functional floor plan, this home offers the perfect balance of style, space and comfort. Enjoy the convenience of a two-car garage an in-ground pool, a large backyard for outdoor entertaining, and easy access to top-rated schools, parks and commuter routes. Hot Tub to Remain as gift. Seller never used fireplace.— Dell Realty Inc.

Key details

  • 2,415 sq ft
  • 21,780 lot sq ft
  • 4 beds
  • 3 baths
  • 1780 built
  • $403 / sq ft
  • $9,646 2025 taxes
MLS #
7⁠3⁠5⁠0⁠8⁠8⁠1⁠0⁠
Last updated
Address
38 North Main ST
Town
Middleton, MA
ZIP
01949
Deed (Bk/Pg)
41426 / 482

Map

Neighborhood: Middleton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.