Skip to main content

Listing broker remarks

Exceptional fully renovated Cape on 7.4 buildable acres in Middleboro, MA — 3 beds, 3.5 baths, 3,060 sq ft, nearly $300K in upgrades, 90% updated. Two stunning custom kitchens: chef's kitchen w/ dual stainless hoods, dark granite, vaulted shiplap ceiling & gas range; plus 2nd kitchen w/ quartz waterfall island, navy cabinetry, exposed beam ceiling & barn door. Designer laundry room w/ Maytag W/D, quartz countertop & hex tile backsplash. Half bath on main level. Entire 2nd floor = 544 sq ft master suite w/ vaulted ceilings, 111 sq ft WIC, mini-split A/C & private bath. Finished basement rec room w/ LVP & crown molding. 7.4 buildable acres — second home, ADU, hobby farm, equestrian, or development potential. Brand-new Middleborough MBTA Station (opened Mar 2025) to Boston's South Station in ~1 hr. Easy access to Rte 44, I-495 & Rte 3. 38 miles to Boston. Rare South Shore legacy property — Middleboro MA 02346.— Keller Williams Realty Signature Properties

Key details

  • 3,060 sq ft
  • 7.40 acres
  • 3 beds
  • 3.5 baths
  • 1850 built
  • $302 / sq ft
  • $6,340 2022 taxes
MLS #
7⁠3⁠5⁠3⁠2⁠2⁠0⁠8⁠
Last updated
Address
145 Marion Road
Town
Middleboro, MA
ZIP
02346

Map

Neighborhood: Middleboro

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.