Skip to main content

Listing broker remarks

Framing starting soon. Foundation is in! Close to Schools and commuter routes. Welcome to the Ashford plan our most popular floor plan with the heart of the home featuring a quartz island, dining area, stainless steel appliances gleaming hardwood flooring. Fireplaced great room, dining room and study are complete with Hardwood floors & crown molding. Your master bedroom get away features an en suite bath with his and her vanities, tiled shower and soaking tub. Included upgrades are Farmers porch/Portico with metal roof, Partial walkout basement and 12 x 16 Deck. More up grades will be added as construction progresses and price will increase accordingly. Still time to make your own selections with the expert help of our decorator. Summer delivery! More Lots and plans available. #MendonMA #LuxurySingleFamilyHomes #NewConstruction #MendonHomes— Mendon Area Real Estate

Key details

  • 2,751 sq ft
  • 2.03 acres
  • 4 beds
  • 2.5 baths
  • 2026 built
  • $391 / sq ft
  • $99,999,999 2025 taxes
MLS #
7⁠3⁠4⁠8⁠1⁠1⁠2⁠9⁠
Last updated
Address
Lot 20A Rawson Farm
Town
Mendon, MA
ZIP
01756
Deed (Bk/Pg)
59211 / 243

Map

Neighborhood: Miscoe Springs

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.