Skip to main content

Listing broker remarks

OPEN HOUSE CANCELLED THIS WEEKEND! SELLERS ACCEPTED AN OFFER. Built in 2022, this stunning resale offers a modern open-concept design highlighted by an oversized great room with a cozy fireplace—perfect for relaxing or entertaining. The bright, expanded kitchen features granite countertops, stainless steel appliances, and gleaming hardwood floors throughout the main level, with direct access to a 12x10 rear deck overlooking a private backyard. The upper level includes three generously sized bedrooms, including a spacious primary suite with a walk-in closet and a full private bath. A second full bathroom and convenient second-floor laundry complete this level. The fully finished basement provides additional living space and includes walkout sliders to the backyard. A large two-car garage with a recently added electric vehicle charging station adds exceptional convenience to this move-in-ready home.— Redfin Corp.

Key details

  • 3,034 sq ft
  • 12,868 lot sq ft
  • 3 beds
  • 2.5 baths
  • 2022 built
  • $296 / sq ft
  • $7,423 2025 taxes
  • HOA a
MLS #
7⁠3⁠4⁠6⁠8⁠2⁠2⁠2⁠
Last updated
Address
40 Timber Crest Dr
Town
Medway, MA
ZIP
02053
Deed (Bk/Pg)
41481 / 128

Map

Neighborhood: Medway

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.