Skip to main content

Listing broker remarks

"Immaculate" is an understatement. This 2yr old, EAST facing HUGHES model shows as new. The 2-story open foyer welcomes all guests & highlights how light & bright the space is. Open concept design has an expanded kitchen & dining area overlooking an oversized FR w/ gas fireplace. Kitchen offers custom cabinetry, SS appliances, double pantry cabinets, quartz counters, tile backsplash & gas cooking. The 8' slider flows to your 12x10 rear deck & private back yard where you can take in nature. Flex room on the first floor can be used as formal DR/LR/office. 1st floor 9' ceilings. Upstairs has 3 large BRs, incl a vaulted primary BR w/ walk-in closet, full bath (tiled shower) & flex space for nursery/office/extra closet. Add'l hallway bath & 2nd floor laundry keeps things organized. 2 car garage & mudroom entry w/ 1/2 bath. Full basement w/ ext stair access & heat/cool zone. Car charger, radon system, enhanced WiFi network (to work from home), So many more extras-see attached list.— Conway - Hanover

Key details

  • 2,762 sq ft
  • 12,666 lot sq ft
  • 3 beds
  • 2.5 baths
  • 2022 built
  • $389 / sq ft
  • $10,427 2025 taxes
  • HOA a
MLS #
7⁠3⁠4⁠7⁠9⁠5⁠5⁠4⁠
Last updated
Address
26 Timber Crest Dr
Town
Medway, MA
ZIP
02053
Deed (Bk/Pg)
41344 / 483

Map

Neighborhood: Timber Crest Estates

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.