Skip to main content

Listing broker remarks

Exceptional new construction tucked on a cul-de-sac—spacious, modern living with flexible multi-family potential. This home offers 7 bedrooms and 4 baths, including a self-contained 2-bed in-law suite with a granite kitchen, breakfast island, full bath, and laundry hookups. Main living features an open great room anchored by a dramatic see-through gas fireplace, and a chef’s kitchen with double ovens, drawer microwave, quartz counters, large island, and a butler’s pantry for added storage and prep. The luxurious primary suite pampers with a soaking jet tub positioned before its own gas fireplace. High-end systems include full irrigation, solar panels, a whole-house generator, central A/C, and a direct police/fire alarm hookup. A four-car garage provides ample parking; the basement and third level are roughed for future expansion. Modern efficiency and upscale finishes combine for a turn-key lifestyle.— Keller Williams Realty

Key details

  • 4,791 sq ft
  • 1.15 acres
  • 7 beds
  • 4 baths
  • 2026 built
  • $332 / sq ft
  • $10,545 2025 taxes
MLS #
7⁠3⁠5⁠1⁠0⁠3⁠1⁠8⁠
Last updated
Address
13 Park Pl
Town
Mattapoisett, MA
ZIP
02739
Deed (Bk/Pg)
57029 / 188

Map

Neighborhood: Mattapoisett

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.