Skip to main content

Listing broker remarks

Located on a lovely tree-lined street just steps to Glover School,this beautifully maintained 8+ room home blends timeless character w/modern comfort.The bright & expansive 1st flr features an open layout w/hardwood floors thru out,a FP living room, family room, home office, 4-season sunroom, & a modern kitchen w/dining area, perfect for everyday living & entertaining. 3 renovated bathrooms include the addition of a stunning primary bath & walk-in closet.The spacious primary bedroom offers dramatic cathedral ceilings,along with 2 oversized bedrooms.A flexible floor plan provides potential for a 1st floor 4th bedroom, ideal for guests,or extended family.Recent improvements include a new HE gas furnace, Central AC, exterior wood shingle replacement, freshly painted interior & exterior & more! The finished LL adds valuable bonus living space.Outside,enjoy a large deck,for entertaining, play or relaxation,overlooking a beautifully landscaped,level fenced yard w/irrigation.Simply Perfect!— Conway - Swampscott

Key details

  • 3,117 sq ft
  • 7,209 lot sq ft
  • 3 beds
  • 4 baths
  • 1958 built
  • $433 / sq ft
MLS #
7⁠3⁠5⁠2⁠1⁠3⁠9⁠5⁠
Last updated
Address
30 Shetland Rd
Town
Marblehead, MA
ZIP
01945

Map

Neighborhood: Clifton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.