Skip to main content

Listing broker remarks

This Spacious light-filled 3-bedroom, 2.5-bath post-and-beam contemporary home sits in the sought-after Clifton neighborhood, offering an open layout ideal for living and entertaining. The eat-in kitchen features a breakfast nook and Sub-Zero refrigerator, flowing into a bright dining area and a dramatic living room with vaulted ceilings, floor-to-ceiling windows, a stone fireplace, and deck access. A spacious den opens to multiple decks, patio, and a private yard. Upstairs, the primary suite includes two walk-in closets, a full bath, and built-ins, while two additional bedrooms share a bath. A private office with its own staircase is perfect for remote work. The finished lower level offers flexible space, cedar closets, and separate outdoor access. Near beaches, shops, and Boston.— Coldwell Banker Realty - Marblehead

Key details

  • 2,772 sq ft
  • 15,681 lot sq ft
  • 3 beds
  • 2.5 baths
  • 1983 built
  • $450 / sq ft
  • $11,610 2026 taxes
MLS #
7⁠3⁠5⁠0⁠1⁠2⁠8⁠0⁠
Last updated
Address
2 Rolleston Rd
Town
Marblehead, MA
ZIP
01945

Map

Neighborhood: Marblehead

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.