Skip to main content

Listing broker remarks

Welcome to 16 Liberty Road—an exceptional 2024 custom home with modern and bright coastal style and post-build high-end upgrades. 4 bedrooms, 3.5 baths, multiple en-suites, plus a dedicated office. Bright, professionally-designed open-concept living with seamless kitchen/dining/living flow—made for entertaining. The lower level delivers a finished space with audiophile in-ceiling speakers plus a separate unfinished area with a state-of-the-art dry system and outstanding storage. Enjoy a fenced yard, refinished mahogany deck, sprinkler system, heated two-car attached garage, and a new custom shed—all on a newly repaved private road. Just two houses from the harbor with beach/dock access, and directly across from Stramski’s Park.— William Raveis R.E. & Home Services

Key details

  • 3,074 sq ft
  • 10,280 lot sq ft
  • 4 beds
  • 3.5 baths
  • 2023 built
  • $969 / sq ft
  • $19,450 2026 taxes
MLS #
7⁠3⁠4⁠9⁠7⁠0⁠2⁠7⁠
Last updated
Address
16 Liberty Road
Town
Marblehead, MA
ZIP
01945
Deed (Bk/Pg)
41096 / 542

Historic designations

MACRIS Inventory
Gerry Playground - Stramski Property

What this means for buyers →

Map

Neighborhood: Marblehead

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.