Skip to main content

Listing broker remarks

Gorgeous custom-built home in Manchester-by-the-Sea is set on a beautifully professionally landscaped lot, surrounded by extensive woodlands and miles of trails. This 4-bedroom, 5-bath residence offers a first floor primary suite and a sophisticated elegant interior. At the center of the home, a dramatic two-sided stone fireplace creates an inviting focal point. The stunning kitchen features white cabinetry, granite counter tops, all-new appliances, and access to an expansive deck overlooking the lovely garden. A custom outdoor stone fireplace creates the perfect setting for entertaining. A 2023 extensive renovation created a brand new family room, fourth bedroom/office, full bathroom, and laundry room. The finished lower level offers versatile space with abundant storage. Close to downtown Manchester with its beaches, harbor, commuter rail and top rated schools. Showings start at the open houses on Saturday, June 20 11 AM - 1 PM and Sunday, June 21, 11 AM - 1 PM.— Coldwell Banker Realty - Manchester

Open Houses

Key details

  • 4,562 sq ft
  • 22,172 lot sq ft
  • 4 beds
  • 3 baths
  • 1988 built
  • $415 / sq ft
  • $13,601 2025 taxes
MLS #
7⁠3⁠5⁠3⁠6⁠4⁠7⁠4⁠
Last updated
Address
21 Forest Lane
Town
Manchester, MA
ZIP
01944
Deed (Bk/Pg)
42384 / 311

Map

Neighborhood: Manchester

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.