Skip to main content

Listing broker remarks

OPEN HOUSE LOCATION IS 160 WILLARD RD ASHBURNHAM Saturday May 2 from 1130-1PM. New construction home set about 400 ft from the road. Inside the home you are welcomed in a large open foyer, the first floor is a huge open concept layout, with engineered hardwood floors. The kitchen is upgraded with quartz tops, gas range with custom exhaust hood, white porcelain farmers sink and huge walk in pantry. Family room is huge and features cathedral ceiling, and fireplace with custom mantle. Entrance from garage is a large mudroom with convenient built-ins, half bath and laundry. Up the hardwood stairs are 3 bedrooms with common bath. Plus an amazing master suite, with cathedral ceiling and a master bath to fall in love with, tiled shower with glass door and a freestanding soaking tub. Site gives us a full walkout basement. Unfortunately there are too many custom features to list included that set this home apart, please schedule a site visit to start planning your dream homE— Freedom Real Estate

Key details

  • 2,652 sq ft
  • 3.67 acres
  • 4 beds
  • 2.5 baths
  • 2026 built
  • $339 / sq ft
MLS #
7⁠3⁠5⁠0⁠3⁠4⁠4⁠4⁠
Last updated
Address
Lot C Chase Rd
Town
Lunenburg, MA
ZIP
01462

Map

Neighborhood: Lunenburg

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.