Skip to main content

Listing broker remarks

Beautiful new construction home by a respected local builder known for exceptional craftsmanship and attention to detail. Offering 4-5 bedrooms, 4 full baths, and a flexible floor plan, this home is designed for today's lifestyle. The open-concept layout features an oversized family room with a coffered ceiling and wood-burning fireplace. A versatile flex space off the primary suite is perfect for a second office, nursery, or fitness area. Additional highlights include a spacious primary bath, second-floor laundry, a large private patio, and a farmer's porch overlooking scenic farmland views. Buyers still have time to personalize finishes, including paint colors, tile, carpeting, and light fixtures. Scheduled for completion in September. Don't miss your chance to own a thoughtfully designed new construction home in sought-after Littleton, featuring top-rated schools, a vibrant community, and local farm stands. No corners cut, no details overlooked—just the quality and care you deserve.— Keller Williams Realty Boston Northwest

Key details

  • 3,905 sq ft
  • 40,097 lot sq ft
  • 5 beds
  • 4 baths
  • 2026 built
  • $367 / sq ft
MLS #
7⁠3⁠5⁠3⁠3⁠2⁠6⁠6⁠
Last updated
Address
2 Colburn Lane
Town
Littleton, MA
ZIP
01460
Deed (Bk/Pg)
66261 / 311

Map

Neighborhood: Littleton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.