Skip to main content

Listing broker remarks

Beautiful new construction split-level home offering modern design, energy efficiency, and quality finishes throughout! This above-grade split features 3 bedrooms and 3 full bathrooms with an open-concept layout, vaulted ceilings, and hardwood flooring throughout the main level. The stunning kitchen offers white shaker soft-close cabinets, quartz countertops, large center island, stainless steel Energy Star appliances, and flows seamlessly into the dining and living areas. Spacious primary suite includes walk-in closet and private full bath with stand-up shower. The finished lower level features durable LVP flooring, a generous family/bonus room, home office, laundry room, and full bath with oversized tiled shower—ideal for guests, remote work, or additional living space. Additional features include heat pump heating & central A/C, heat pump hot water system, spray foam insulation, Energy Star windows and doors, and impressive 45 HERS energy rating. Perfectly located for commuters.— Mega Realty Services

Key details

  • 1,898 sq ft
  • 12,162 lot sq ft
  • 3 beds
  • 3 baths
  • 2026 built
  • $342 / sq ft
  • $2,272 2025 taxes
MLS #
7⁠3⁠5⁠1⁠5⁠6⁠5⁠6⁠
Last updated
Address
272 S Main St
Town
Hopedale, MA
ZIP
01747
Deed (Bk/Pg)
64155 / 139

Map

Neighborhood: Hopedale

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.