Skip to main content

Listing broker remarks

**OFFER DEADLINE SET for Saturday 6/13/26 at 12pm** Great opportunity to enter the housing market OR downsize to single-level living! Set on a .58-acre wooded lot, this two-bedroom ranch offers hardwood floors throughout much of the home, fresh paint, updated lighting, and a bright living room featuring a fireplace with sconce lighting. The kitchen opens to a three-season porch overlooking the private backyard and provides access to the attached one-car garage. Two bedrooms, a full bath, and a partially finished room in the basement adds extra space for work, hobbies, or recreation. Ductless mini-splits provide efficient heating and cooling. Oil tank replaced in 2016. A backup generator will remain for the new owner. While the kitchen and bath could benefit from updating, this home offers a solid opportunity to build equity and make it your own.— ERA Key Realty Services

Key details

  • 963 sq ft
  • 25,221 lot sq ft
  • 2 beds
  • 1 baths
  • 1956 built
  • $363 / sq ft
  • $5,662 2025 taxes
MLS #
7⁠3⁠5⁠3⁠1⁠4⁠8⁠4⁠
Last updated
Address
114 Plain St
Town
Hopedale, MA
ZIP
01747
Deed (Bk/Pg)
24768 / 42

Map

Neighborhood: Hopedale

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.