Skip to main content

Listing broker remarks

Location Location Location ! Located in an established neighborhood and a commuters dream. This well cared home offers a dine in kitchen with center island, SS appliances, granite counters, tile backsplash and trendy grey cabinetry . OPen to formal dining room accent with crown molding wainscoting and hardwood floors, French door welcomes you to the family room with cathedral ceilings, Wood burning FP and palladium windows . This is perfect space for large gatherings and celebrations. Additional room is ideal from an office or den . Second floor offers 3 generous size bedrooms with ample closet space , and guest bathroom . Primary suite comfortably holds king size furniture, spacious closet space and private bath . Lower level is partially finished perfect for a play room or added storage. Located on a corner lot with sun drenched deck prefect for your summer enjoyment .— Janice Mitchell R.E., Inc

Key details

  • 2,248 sq ft
  • 10,000 lot sq ft
  • 3 beds
  • 2.5 baths
  • 2003 built
  • $311 / sq ft
  • $8,137 2026 taxes
MLS #
7⁠3⁠5⁠2⁠2⁠4⁠2⁠3⁠
Last updated
Address
15 TYLER DRIVE
Town
Holden, MA
ZIP
01520
Deed (Bk/Pg)
56689 / 84

Map

Neighborhood: Holden

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.