Skip to main content

Listing broker remarks

Built in 2023, this stunning custom home offers 4 bedrooms, a home office, and 3.5 baths across 3,928 sq ft of beautifully designed living space in one of Hingham’s most desirable neighborhoods. The open-concept first floor features a sun-filled living room, dining area, designer kitchen, private office, and full bath perfect for modern living and entertaining. The second floor offers 3 spacious bedrooms and 1 full baths, while the entire third level is dedicated to a luxurious primary suite complete with spa-like bath, closet space, and private laundry. Additional laundry on the second floor adds convenience. Step outside to your private backyard oasis featuring a built-in gas grill connected directly to natural gas, outdoor lounge area with bar and TV, additional patio space, and beautifully landscaped grounds ideal for entertaining. Two-car garage plus ample off-street parking. Located in the highly sought-after Hingham school district and close to shopping, and commuter access.— Coldwell Banker Realty - Westwood

Key details

  • 3,928 sq ft
  • 36,908 lot sq ft
  • 4 beds
  • 3.5 baths
  • 2023 built
  • $558 / sq ft
  • $19,267 2025 taxes
MLS #
7⁠3⁠5⁠2⁠5⁠2⁠7⁠8⁠
Last updated
Address
295 Gardner st
Town
Hingham, MA
ZIP
02043
Deed (Bk/Pg)
56836 / 171

Map

Neighborhood: Hingham

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.