Skip to main content

Listing broker remarks

New Bradford Colonial Condex on a dead end street. This home lives like an attached single family. FINISHED and ready to go! Fantastic layout with large sun-drenched open rooms and high ceilings. Wonderful open floor plan featuring a large kitchen with plenty of cabinets, granite counters. Dining area with a slider leading to deck and level usable back yard.. Hardwood throughout the house. Fireplace, central air. Well sized bedrooms all on the 2nd floor. Basement with plenty of storage . This home is convenient to shopping and minutes to the highway. NO MONTHLY CONDO FEE. This is a condo with the feel of single family living. Haverhill has several newer schools and great downtown filled with shops and restaurants and river walk. 2 commuter train stops with parking! Easy drive to rts 495, 95 and 93. Lot size represents the total piece of land.— Berkshire Hathaway HomeServices Verani Realty Bradford

Key details

  • 1,520 sq ft
  • 11,408 lot sq ft
  • 3 beds
  • 2 baths
  • 2026 built
  • $368 / sq ft
  • HOA HOA
MLS #
7⁠3⁠5⁠3⁠3⁠4⁠8⁠4⁠
Last updated
Address
22 Greystone
Unit
22
Town
Haverhill, MA
ZIP
01835

Map

Neighborhood: Haverhill

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.