Skip to main content

Listing broker remarks

Welcome to Cervelli Farm Estates—Hanover’s newest premier neighborhood! Lot 2 showcases an exquisite luxury home blending modern elegance, timeless design, and refined sophistication. The modern luxurious exterior sets the tone for what’s inside—elegance paired with comfort and beautifully curated finishes. Inside, discover 5 bedrooms and 4.5 baths, including a first-floor suite ideal for guests, multi-generational living, or aging in place. The open great room flows seamlessly into a stunning kitchen and dining area, perfect for entertaining or everyday living. Upstairs, a serene primary suite and generously sized bedrooms offer both space and style. Set on a peaceful cul-de-sac surrounded by nature, this home defines luxury, warmth, and timeless appeal.— The Firm

Key details

  • 4,000 sq ft
  • 30,001 lot sq ft
  • 5 beds
  • 4.5 baths
  • 2026 built
  • $489 / sq ft
  • $99,999 00 taxes
MLS #
7⁠3⁠4⁠4⁠9⁠8⁠5⁠5⁠
Last updated
Address
23 Cervelli Farm Dr
Town
Hanover, MA
ZIP
02339

Map

Neighborhood: Cervelli Farm Estates

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.