Skip to main content

Listing broker remarks

This 2800 sq ft colonial is set on almost an acre of land, features beautiful wide wood flooring throughout most of the home, a spacious layout, a large open staircase, exposed wood beam and a cozy living room with a fireplace. The home offers four bedrooms, with a bathroom on the first and second level, a separate laundry room by the bedrooms and a full basement which adds incredible potential to be finished or for storage and a workshop. The master bedroom is grand with cathedral ceiling, exposed wood beam and walk-in closet. The large back deck is a perfect place to relax and enjoy the peaceful setting. The shed on the left of the home is insulated and was built 6 years ago. Roof was installed 10 years ago and the furnace 13 years. It's not often you find this kind of home with tranquil setting, all while being just minutes from highways, shops, restaurants, and the commuter rail.— RE/MAX Partners

Key details

  • 2,800 sq ft
  • 40,050 lot sq ft
  • 4 beds
  • 1.5 baths
  • 1982 built
  • $249 / sq ft
  • $8,121 2025 taxes
MLS #
7⁠3⁠5⁠1⁠6⁠5⁠2⁠4⁠
Last updated
Address
325 River Street
Town
Halifax, MA
ZIP
02338
Deed (Bk/Pg)
56560 / 259

Map

Neighborhood: Halifax

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.