Skip to main content

Listing broker remarks

Newly renovated single floor home in Housatonic, just minutes from downtown Great Barrington, Tanglewood, and everything the Berkshires have to offer. With direct access to the Rail Trail, this move-in ready home is set on .93 acres, the property features a spacious yard and greenhouse, offering plenty of room to relax, garden, or entertain. The updated kitchen features stone countertops, stainless steel appliances, an induction range, and new LVP flooring. Both bathrooms have been fully renovated with Schluter waterproof systems. Additional upgrades include smart Lutron lighting with Alexa control, a Rheem smart hot water heater, Ring cameras, new 200-amp electrical service, a new driveway and retaining wall, irrigation system, freshly painted exterior, and a new septic installed in 2025!— Century 21 North East

Key details

  • 1,092 sq ft
  • 40,510 lot sq ft
  • 3 beds
  • 2 baths
  • 1936 built
  • $347 / sq ft
  • $4,254 2025 taxes
MLS #
7⁠3⁠5⁠2⁠6⁠9⁠6⁠5⁠
Last updated
Address
386 North Plain Rd
Town
Great Barrington, MA
ZIP
01201
Deed (Bk/Pg)
515 / 42

Map

Neighborhood: Great Barrington

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.