Skip to main content

Listing broker remarks

This new modern farmhouse is currently under construction.The heart of this single-family residence is undoubtedly its collection of thoughtfully designed spaces. 3 bedrooms, 2 and one half baths, and 2-car garage.The spacious primary suite features a full en-suite bath and a large walk-in closet.The open-concept layout connects the kitchen, dining area, and family room, creating a perfect space for everyday living and entertaining.Just off the kitchen, you'll find a generous walk-in pantry.Half bath, laundry room, and convenient mudroom bench area are located near the garage entry.Two additional bedrooms and a full bath complete the interior of this thoughtfully designed home.Large front and rear porches make for flexible space ideal for hosting. With 1985 square feet of living space, there is plenty of room to live and grow.Envision each room becoming a personalized haven, reflecting individual style and creating a restful atmosphere.1.38 acres of blank canvas to make yours.— REMAX Connections - Belchertown

Key details

  • 1,985 sq ft
  • 1.38 acres
  • 3 beds
  • 2.5 baths
  • 2025 built
  • $401 / sq ft
MLS #
7⁠3⁠4⁠1⁠1⁠6⁠5⁠7⁠
Last updated
Address
337 Chicopee
Unit
Lot 8
Town
Granby, MA
ZIP
01033
Deed (Bk/Pg)
4864 / 210

Map

Neighborhood: Granby

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.