Skip to main content

Listing broker remarks

**Builder's last house! Price reduction as builder looks to clear out inventory, you won't find a better deal for new construction!!! Great Floorplan! Beautifully crafted 4-bedroom, 2.5-bath new construction, boasting 2,788 sq. ft. of stylish living space. The inviting open layout on the first floor is designed for modern living, featuring stunning hardwood floors that enhance the warm and welcoming atmosphere. The spacious living room is complete with a cozy fireplace, perfect for gatherings and relaxation. Step outside to enjoy a private deck, seamlessly extending your living space for outdoor entertaining. The well-appointed kitchen includes a generous pantry, offering ample storage for all your culinary needs. A delightful dining area completes the space, making it perfect for both casual meals and special occasions. Retreat to the primary suite, where you’ll find a large walk-in closet and an en-suite bathroom designed for comfort and convenience. MOVE-IN this May.— Herrick Lutts Realty Partners

Key details

  • 2,788 sq ft
  • 9,357 lot sq ft
  • 4 beds
  • 2.5 baths
  • 2025 built
  • $358 / sq ft
  • HOA a
MLS #
7⁠3⁠4⁠7⁠7⁠1⁠0⁠5⁠
Last updated
Address
66 Parish Road
Unit
8
Town
Georgetown, MA
ZIP
01833
Deed (Bk/Pg)
42441 / 111

Map

Neighborhood: Georgetown

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.