Skip to main content

Listing broker remarks

Don't miss this opportunity to own a beautifully updated 4-bedroom Cape in this sought-after SAXONVILLE neighborhood! The flexible floor plan offers a RARE 3 bedrooms and full bath upstairs plus spacious 4th bedroom and 2nd full bath on the first floor - perfect for guests, or to double as home office or playroom. You'll love the calming aesthetic throughout - with fresh paint and hardwood floors on both levels. A full basement and oversized garage provide storage and tinker space - and the mud room is an ideal "drop zone" for outerwear, pet stations, or sports gear. Lucky for you, the current owners have *just* invested approximately $100K in MAJOR improvements, including new roof, new windows, and Everlast siding in 2025, allowing you to move right in with peace of mind! The large, level backyard is ready for games, gardening, entertaining, or just chilling out after the nearby public beach, bike trail, park or nature trail. A perfect combo of location, updates, & value—a “must see!”— Realty Executives Boston West

Key details

  • 1,522 sq ft
  • 11,761 lot sq ft
  • 4 beds
  • 2 baths
  • 1960 built
  • $443 / sq ft
  • $6,561 2026 taxes
MLS #
7⁠3⁠5⁠2⁠9⁠5⁠2⁠6⁠
Last updated
Address
7 Brigati Terrace
Town
Framingham, MA
ZIP
01701
Deed (Bk/Pg)
72537 / 169

Map

Neighborhood: Saxonville

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.