Skip to main content

Listing broker remarks

Move-in ready Cape style home with rear dormer. Clean and shaded farmer's porch looking out over quiet dead-end street. Large open living room with Cathedral ceiling and fireplace adjoining eat-in-kitchen. 3 Season porch off of kitchen/living room leading out to flat back yard with newly lined semi-inground pool. Separate dining area with built-in hutch, two first floor bedrooms and full bath. Primary bedroom on second floor with California closet. Additional second floor bedroom. Partially finished basement with living room. Solar panels (owned) providing savings on electric bills. Convenient to shopping/restaurants in Framingham/Natick, and nearby trails/parks. Excellent opportunity for the convenience of Framingham, and the quiet of a dead end.— Home Town Brokerage

Key details

  • sold
  • 1,800 sq ft
  • 12,196 lot sq ft
  • 4 beds
  • 2 baths
  • 1952 built
  • $427 / sq ft
MLS #
7⁠3⁠5⁠0⁠1⁠0⁠0⁠0⁠
Last updated
Address
5 Barker
Town
Framingham, MA
ZIP
01701
Sold for
$775,000
Deed (Bk/Pg)
67683 / 566

Map

Neighborhood: Framingham

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.