Skip to main content

Listing broker remarks

Stunning, updated Garrison Colonial close to the Sudbury line! Featuring Gourmet Kitchen with Large stainless steel, 6 burner gas Stove/hood. Oversized Kitchen with Quartz countertops, tiled backsplash, large island with corner wine & beverage cooler. Beautiful open concept layout from Kitchen to Family room with accent wall. Sliding doors that leads you out to a large deck for entertaining, Master bedroom suite with a walk in closet and a private balcony overlooking of the back fence-in yard. Finished basement, with family room and office space. New French drain system & sump pump,, lots of parking plus 2 car garage with a EV plug hook up. 2 brand new Heat pump systems in 2026. Easy access to route20/route 9 and major highways. 80+ feet setback from road. Very close to shopping and restaurant areas.— RE/MAX One Call Realty

Key details

  • 2,342 sq ft
  • 20,038 lot sq ft
  • 4 beds
  • 2.5 baths
  • 1974 built
  • $362 / sq ft
  • $8,930 2026 taxes
MLS #
7⁠3⁠5⁠2⁠1⁠2⁠2⁠7⁠
Last updated
Address
1239 Edgell Rd
Town
Framingham, MA
ZIP
01701
Deed (Bk/Pg)
81026 / 337

Map

Neighborhood: Framingham

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.