Skip to main content

Listing broker remarks

Commercial Construction That Needs Interior Finishes. Ideal Location for Commercial Property with Many Possible Usages (Doctors, Dentist, Lawyer Offices, Hair Salon, Bakery or any other creative ideas). Zoning is presently RB. Seller Willing to Entertain all Offers and to Work with Buyers to Obtain Special Permit for Commercial Use. Handicap Access & Use on first floor. Commercial Wired 400 Amp Meter Bank By-Pass Panel 2 Separate Lines 100-200 Amp Service.Tight Tank Plus 5 Bedroom Septic. Cast No Hub Throughout the Structure with Commercial Grade Copper. 5 Commercial Grade Water Tanks. 2 Commercial Grade Hydro Air Systems. Mini Split Unit for Heat/A/C Over 2 Car Garage. Garage Doors with Jack Shift Masters. Garage Ceiling Height 11.5 Feet. First Floor Ceiling Height 11 Feet. Toro Sprinkler System.— Coldwell Banker Realty - Worcester

Key details

  • 4,046 sq ft
  • 21,127 lot sq ft
  • 4 beds
  • 3.5 baths
  • 2001 built
  • $364 / sq ft
  • $3,778 2025 taxes
MLS #
7⁠3⁠4⁠8⁠0⁠5⁠2⁠6⁠
Last updated
Address
28 Nathan Ellis Highway
Town
Falmouth, MA
ZIP
02556

Map

Neighborhood: Falmouth

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.