Skip to main content

Listing broker remarks

Welcome to 604 Woodlawn Street in Fall River! This inviting single-family home with a garage sits on a corner and offers 2 first-floor bedrooms plus a 3rd room with a 2nd full bath on second floor totaling 1,389 sq ft of living space. Ideal for single-level living, the main floor features hardwood flooring and a functional layout. Enjoy added versatility with a full basement for storage. Recent updates include a new roof (2020), gas heating system (2016), hot water tank (2025), updated bathroom (approx. 4 years), updated bathroom 4 years ago, and newer windows (within 2 years). Situated on a corner lot with a 1-car garage, fenced yard, screened-in porch, and backyard patio—perfect for relaxing or entertaining! Open house Saturday, May 30th 12:00-1:30— RE/MAX Vantage

Open Houses

Key details

  • 1,389 sq ft
  • 5,772 lot sq ft
  • 3 beds
  • 2 baths
  • 1948 built
  • $312 / sq ft
  • $4,161 2025 taxes
MLS #
7⁠3⁠5⁠1⁠2⁠3⁠4⁠1⁠
Last updated
Address
604 Woodlawn Street
Town
Fall River, MA
ZIP
02720
Deed (Bk/Pg)
8934 / 109

Map

Neighborhood: Fall River

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.