Skip to main content

Listing broker remarks

Thoughtfully updated and move-in ready, this charming 3-bedroom cottage offers a blend of functionality and character. The main level features open living and dining areas that flow into an updated kitchen with quartz countertops, stainless steel appliances, and modern finishes. A beautifully remodeled full bath with contemporary fixtures and laundry hookups adds everyday convenience, while the first-floor bedroom offers flexibility for guests, a home office, or single-level living. Two additional bedrooms upstairs provide private retreats. Outside, the fenced backyard and patio extend the home's appeal, creating the perfect setting for entertaining, gardening, pets, or simply enjoying time outdoors. Recent improvements, including updated flooring, vinyl siding, and other thoughtful upgrades, make this a home ready to be enjoyed from day one. Discover how easily life can fit here. Schedule your private showing today!— Gibson Sotheby's International Realty

Key details

  • 778 sq ft
  • 4,386 lot sq ft
  • 3 beds
  • 1 baths
  • 1930 built
  • $546 / sq ft
  • $3,481 2026 taxes
MLS #
7⁠3⁠5⁠3⁠4⁠8⁠3⁠1⁠
Last updated
Address
452 Tecumseh St
Town
Fall River, MA
ZIP
02721
Deed (Bk/Pg)
11354 / 56

Map

Neighborhood: Fall River

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.