Skip to main content

Listing broker remarks

Beach Farm is an extraordinary 18.6-acre waterfront estate offering exceptional privacy, 1,700 feet of water frontage, sweeping Atlantic views, private beaches, a rare walking path to the pristine South Shore, and a short bike ride to Edgartown Village. The estate is set within the storied 200-acre Herring Creek Farm, a coastal enclave surrounding a working farm with barns, horses, sheep, and open meadows. Bordering both the 900-acre Edgartown Great Pond and the Atlantic Ocean, Beach Farm includes a six-bedroom main residence completed in 2023 with expansive walls of glass that frame dramatic, panoramic views across the pond and ocean. Built to the highest standards by master craftsmen, the home is complemented by a three bedroom surf house with outdoor sauna, cold plunge, a workout barn, private walking trails, and secluded beaches.— MGS Group Real Estate LTD

Key details

  • 7,190 sq ft
  • 18.60 acres
  • 9 beds
  • 9 baths
  • 2023 built
  • $4,520 / sq ft
  • $54,765 2026 taxes
MLS #
7⁠3⁠5⁠3⁠6⁠8⁠5⁠9⁠
Last updated
Address
61 Butlers Cove Road
Town
Edgartown, MA
ZIP
02539
Deed (Bk/Pg)
80 / 193

Map

Neighborhood: Edgartown

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.