Skip to main content

Listing broker remarks

New Construction with POOL, GUEST HOUSE and PRIMARY HOME, all within close proximity to Main Street, Edgartown. This four bedroom gambrel homes welcomes you with a two story foyer which opens to a great room with a gourmet kitchen, a bar area and a central island offering seating for at least four. The kitchen flows into the open dining and living room with a gas fireplace. The great room overlooks the outdoor pool and entertaining area. Off the kitchen is a large walk in laundry/pantry room. The 1st floor primary suite has access to the abutting private study. The 2nd floor offers an open lounge area, central to the three bedrooms which all have their own private bathroom. Completing the 2nd floor is a 2 laundry room. Off the 2nd floor lounge area is a set of stairs leading to the 3rd floor lounge. The guest house offers a 1st floor bedroom, a full bath, a kitchen, dining area and lounge area which opens to a deck overlooking the pool area.— Vineyard Village Realty

Key details

  • 5,394 sq ft
  • 18,295 lot sq ft
  • 6 beds
  • 5.5 baths
  • 2025 built
  • $889 / sq ft
  • $3,017 2024 taxes
MLS #
7⁠3⁠3⁠9⁠0⁠1⁠7⁠0⁠
Last updated
Address
23 Pinehurst Road
Town
Edgartown, MA
ZIP
02539
Deed (Bk/Pg)
1676 / 1

Map

Neighborhood: Edgartown

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.