Skip to main content

Listing broker remarks

Welcome to Baron Estates! This beautifully customized Colonial offers nearly 4,000 sq. ft. of finished living space, including a partially finished lower level. Enter from the 3-car garage with EV charging into a mudroom with built-ins. The chef's eat-in kitchen features a center island, walk-in pantry, pot filler, coffee bar, and opens to the great room with a coffered ceiling and fireplace. The formal dining room includes a custom bar with wine fridge, also with coffered ceilings while the spacious living room opens to a home office/playroom. Upstairs offers a versatile loft, luxurious primary suite with custom walk-in closet and spa-like bath, a second ensuite, two additional bedrooms, full bath, and laundry. Enjoy the walk-out deck, stone patio with built-in fireplace, irrigation, and private backyard abutting protected conservation land.— Gibson Sotheby's International Realty

Key details

  • 3,947 sq ft
  • 39,413 lot sq ft
  • 4 beds
  • 3.5 baths
  • 2023 built
  • $367 / sq ft
  • $16,257 2026 taxes
MLS #
7⁠3⁠5⁠3⁠4⁠8⁠1⁠6⁠
Last updated
Address
2 Cooper Lane
Town
Easton, MA
ZIP
02356
Deed (Bk/Pg)
28414 / 324

Map

Neighborhood: Easton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.