Skip to main content

Listing broker remarks

36 and 36R Holly Circle, a fully automated home, is ready for new stewards! This stately 2006 Vinyl sided colonial has everything today's discerning Buyer desires. Luxuriate in the salt water in ground heated pool as you gaze over the gardens and take in breathtaking views of Mt Tom. The Chef's kitchen is the focal point, featuring SS Wolf appliances, a steam oven, a butler's pantry and a gorgeous leathered granite island for many to gather around. A 1st floor ensuite, a large library with built-ins, a spacious dining room and a gorgeous living room with an electric fireplace complete the first level. Crown molding, architecturally styled windows, radiant floor heating, a state-of-the-art-gym, spa, meditation room add to the strong lifestyle aspect. Upstairs are 3 gorgeous ensuite bedrooms w/newer baths. Also enjoy 2nd fl. laundry & a finished third floor complete w/kitchenette and full bath. The apartment also offers flexibility, either as a guest space or a proven income opportunity.— William Pitt Sotheby's International Realty

Key details

  • 7,351 sq ft
  • 41,098 lot sq ft
  • 5 beds
  • 6.5 baths
  • 2006 built
  • $176 / sq ft
  • $13,636 2025 taxes
MLS #
7⁠3⁠4⁠7⁠3⁠2⁠4⁠4⁠
Last updated
Address
36 & 36R Holly Circle
Town
Easthampton, MA
ZIP
01027
Deed (Bk/Pg)
8172 / 308

Map

Neighborhood: Easthampton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.