Skip to main content

Listing broker remarks

Unique multi-level layout featuring a traditional 3-bedroom main floor ranch setup, plus a massive, private multi-room suite over the garage complete with 2 additional bedrooms, a living room, and a full bath- perfect for an au-pair, extended family or a massive primary retreat. Extensive addition done in 2008 with oversized 2 car garage with living space above, addition of 1/2 bath, office and mudroom as well as full re-siding of home, new roof (30yr shingle), Anderson windows, Buderus boiler. 2013 complete remodel of kitchen and open floor plan achieved by opening to dining room and family room. Huge family room with stone front gas fireplace, wood floors & cathedral ceiling. Kitchen with Kraft maid quarter sawn oak cabinets, granite counter tops with a 103" island, tile flooring, SS appliances.Offer Deadline June 16 at 5pm.— Keller Williams Realty

Key details

  • 2,832 sq ft
  • 25,364 lot sq ft
  • 5 beds
  • 2.5 baths
  • 1964 built
  • $204 / sq ft
MLS #
7⁠3⁠5⁠2⁠6⁠1⁠6⁠2⁠
Last updated
Address
6 Brynmawr Dr
Town
East Longmeadow, MA
ZIP
01028
Deed (Bk/Pg)
14262 / 132

Map

Neighborhood: East Longmeadow

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.