Skip to main content

Listing broker remarks

Discover the potential in this bright and sunny 3-bedroom, 1-bath ranch nestled in a highly desirable neighborhood. This home offers a solid layout featuring hardwood flooring throughout the bedrooms and living room, adding warmth and character. The finished basement provides valuable extra space, perfect for a family room, home office, or play area along with a dedicated storage and laundry area for added convenience. A generator hookup offers additional peace of mind. Outside, enjoy a large yard ideal for entertaining, gardening, or relaxing, along with a storage shed for your outdoor needs. The home does require some cosmetic TLC, making it a great opportunity to customize and build equity. New septic to be installed - Plans in hand. Don’t miss this opportunity to make this home your own in a wonderful location!— Coldwell Banker Realty - Norwell - Hanover Regional Office

Key details

  • sold
  • 1,526 sq ft
  • 22,570 lot sq ft
  • 3 beds
  • 1 baths
  • 1972 built
  • $294 / sq ft
  • $6,138 2025 taxes
MLS #
7⁠3⁠5⁠1⁠8⁠8⁠5⁠2⁠
Last updated
Address
84 Branch Rd
Town
East Bridgewater, MA
ZIP
02333
Sold for
$515,000
Deed (Bk/Pg)
17403 / 171

Map

Neighborhood: East Bridgewater

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.