Skip to main content

Listing broker remarks

Tucked within a quiet enclave in Dover’s top-ranked school district, this custom-built residence offers exceptional craftsmanship, scale, and timeless design. Meticulously maintained with top-tier systems and refined finishes throughout, the home features soaring ceilings, sun-filled living spaces, and a seamless blend of elegance and comfort. The stunning chef’s kitchen is outfitted with custom cabinetry, top-of-the-line appliances, and ideal flow for everyday living and entertaining. Offering 5 spacious bedrooms, a finished lower level, and beautifully designed gathering spaces, the home is perfectly suited for modern living. Outside, professionally landscaped grounds, a beautiful patio, expansive yard, and attached 3-car garage complete this exceptional offering in one of Dover’s most sought-after settings.— Corcoran Property Advisors

Key details

  • 6,720 sq ft
  • 1.03 acres
  • 5 beds
  • 6.5 baths
  • 2019 built
  • $444 / sq ft
  • $26,382 2025 taxes
MLS #
7⁠3⁠5⁠1⁠7⁠9⁠3⁠0⁠
Last updated
Address
9 Schaffner Ln
Town
Dover, MA
ZIP
02030
Deed (Bk/Pg)
37683 / 372

Map

Neighborhood: Dover

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.