Skip to main content

Listing broker remarks

Big Price Reduction!!! Act Fast! This brand-new colonial offers over 3,000 sq ft of modern living designed to impress. Featuring 9-ft ceilings and a stunning designer kitchen with an oversized 8-ft island, it’s perfect for entertaining. The open layout flows to a spacious deck, creating seamless indoor-outdoor living. Upstairs, the primary suite is a true retreat with a huge walk-in closet and spa-like bath with double vanity and oversized shower. Three additional bedrooms, a full bath, and second-floor laundry add everyday convenience. An oversized 2-car garage and a 1,500 sq ft basement offer endless potential for storage or future expansion. Set on a corner lot with room to customize landscaping. Don’t miss this incredible value—schedule your showing today!— Keller Williams Elite

Key details

  • 3,000 sq ft
  • 38,245 lot sq ft
  • 4 beds
  • 2.5 baths
  • 2025 built
  • $266 / sq ft
  • $1,599 2025 taxes
MLS #
7⁠3⁠4⁠0⁠7⁠1⁠2⁠7⁠
Last updated
Address
1421 Tremont St.
Town
Dighton, MA
ZIP
02764
Deed (Bk/Pg)
10922 / 20

Map

Neighborhood: Dighton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.