Skip to main content

Listing broker remarks

Located at 2930 Shelburne Falls Rd in Conway, this newly built single-family home showcases clean, modern design with quality finishes including solid doors, porcelain tile, and engineered hardwood flooring. The home offers four well-sized bedrooms featuring spacious closets, along with two full bathrooms and a half bath. With 2,280 square feet of living space, there is plenty of room for everyday living and a variety of lifestyle needs. Set on a 44,866 square foot lot, the property provides privacy and space for outdoor activities, along with a spacious back deck for relaxing or entertaining. Conveniently located just minutes from the center of Shelburne Falls, with easy access to shops, restaurants, and the Bridge of Flowers. This property is the perfect blend of quiet peaceful living and convenient access to nearby amenities— Venture

Key details

  • 2,280 sq ft
  • 1.03 acres
  • 4 beds
  • 2.5 baths
  • 2026 built
  • $315 / sq ft
MLS #
7⁠3⁠4⁠9⁠0⁠4⁠5⁠8⁠
Last updated
Address
2930 Shelburne Falls Rd
Town
Conway, MA
ZIP
01341
Deed (Bk/Pg)
5265 / 102

Map

Neighborhood: Conway

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.