Skip to main content

Listing broker remarks

Walk to everything location, shops, restaurants, Bruce Freeman rail trail, Rideout Playground and the commuter rail. The first of 5 homes to be built by EMS Development. Three finished levels offering 5 bedrooms, including a first-floor primary, 4 full and 2 1/2 baths. The heart of the home is a thoughtfully designed chefs' kitchen with Thermador appliances, prep pantry, and a hickory center island. The open floor plan offers a fireplaced family room and dining area with lots of natural light and 9-foot ceilings. The second floor has 4 bedrooms including an en-suite and gorgeous primary with spa like bathroom. The lower level is also complete with a large playroom, workout room and half bath. Move in ready. Also offering a 2 car garage that enters into a mudroom with custom cabinets. Don't miss out.— Coldwell Banker Realty - Concord

Key details

  • 4,681 sq ft
  • 17,557 lot sq ft
  • 5 beds
  • 4 baths
  • 2025 built
  • $497 / sq ft
  • HOA a
MLS #
7⁠3⁠4⁠2⁠9⁠5⁠7⁠5⁠
Last updated
Address
30 Harness Lane
Town
Concord, MA
ZIP
01742
Deed (Bk/Pg)
83125 / 590

Map

Neighborhood: Concord

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.