Skip to main content

Listing broker remarks

SUMMER OCCUPANCY -NEW CONSTRUCTION! CLOSE TO MINUTEMAN NATIONAL PARK & CONCORD CENTER on quaint Hatch Farm Lane. LAST AVAILABLE HOME!! Originally a historic barn that has been completely REBUILT, REIMAGINED & ADDED TO. Exciting floor plan offers amazing 1 of-a-kind, bright & beautiful living spaces, stunning floors & a luxurious open concept chef's kitchen. The large family room has a NATURAL STONE FIREPLACE & deck access that opens to the exquisite DECK & BLUESTONE PATIO. The stylish dining room is detailed with beautiful wood elements & sconces. A TUCKED AWAY 1ST FLOOR HOME OFFICE ensures privacy & quiet! The 2nd floor offers 3 BEDROOMS, including a grand primary suite! PRIVATE 4TH BEDROOM with ensuite bath is in the lower level which feels like a 1st floor w/large windows & plentiful NATURAL LIGHT! Lower level is perfect for guests/teens. Additional media/play room on this level! Fully curated & FENCED PRIVATE YARD abuts additional 2.83 ACRES assoc/conservation land! TOTALLY CUSTOM!— The Attias Group, LLC

Key details

  • 4,149 sq ft
  • 9,556 lot sq ft
  • 4 beds
  • 3.5 baths
  • 2026 built
  • $721 / sq ft
  • $36,161 2026 taxes
  • HOA a
MLS #
7⁠3⁠4⁠9⁠4⁠9⁠4⁠9⁠
Last updated
Address
16 Hatch Farm Lane
Town
Concord, MA
ZIP
01742

Map

Neighborhood: Concord

Pin shown at town level

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.