Skip to main content

Listing broker remarks

Stunning, sun-filled 12-room home in sought-after Fox Run neighborhood blends classic charm with modern upgrades. The gourmet kitchen features stainless steel appliances, granite countertops, and center island opening to a fireplaced living room and dining area. First floor includes a private office and family room with custom built-ins, fireplace, and access to a three-season porch, deck, and hot tub. Upstairs, five bedrooms and three full baths include a primary suite with walk-in closet and private deck. Finished lower level features a mudroom with built-in storage and bench. Major systems updated: new septic, heating burner, oil tank, and whole-home generator with owned propane serving the grill, stubbed for future gas fireplace or stove. Sprinkler system and landscape lighting complete the exterior. Cul-de-sac living, minutes to commuter boat, train, and the beach.— Coldwell Banker Realty - Hingham

Key details

  • 3,515 sq ft
  • 1.03 acres
  • 5 beds
  • 3.5 baths
  • 1982 built
  • $511 / sq ft
MLS #
7⁠3⁠5⁠2⁠9⁠4⁠7⁠4⁠
Last updated
Address
188 Forest Ave
Town
Cohasset, MA
ZIP
02025
Deed (Bk/Pg)
37895 / 6

Map

Neighborhood: Cohasset

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.