Skip to main content

Listing broker remarks

Well-loved and meaningfully updated, this home offers the convenience and comfort of one level living, backed by a new roof (2023) and whole-house insulation (2022). The generous sized living room welcomes you into the home with an abundance of natural light from the large picture window. The kitchen is neat and efficient and connects with a fully remodeled dining room. Down the hall are 3 bedrooms with refreshed hardwood floors and a recently updated bath. The true gem of the house is the 2023, 370+ SF family room addition with three large walls of windows and vaulted ceiling, offering exceptional gathering space looking directly out onto the back yard. The basement is partially finished, with a radon mitigation system (2021) and a new hot water heater, providing opportunity for additional living space. Outside, enjoy a great level back yard, ideal for relaxing or gardening. This wonderful home is located near Heart Pond, Cranberry Bog Conservation and Great Brook Farm State Park.— Keller Williams Realty Boston Northwest

Key details

  • 1,317 sq ft
  • 20,908 lot sq ft
  • 3 beds
  • 1 baths
  • 1955 built
  • $447 / sq ft
  • $6,815 2025 taxes
MLS #
7⁠3⁠5⁠3⁠4⁠3⁠6⁠0⁠
Last updated
Address
75 Proctor Road
Town
Chelmsford, MA
ZIP
01824
Deed (Bk/Pg)
35877 / 45

Map

Neighborhood: Chelmsford

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.