Skip to main content

Listing broker remarks

Step into this beautifully renovated waterfront home on Vaugh's Pond, thoughtfully updated just two years ago. Enjoy the stunning water views from the expansive wraparound deck-perfect for relaxing or entertaining. Inside, the home features a modern kitchen with brand new quartz countertops and stainless Energy Star appliances, blending style with efficiency. The partially finished walkout basement adds valuable living space and opens to a covered patio, creating the perfect indoor-outdoor flow for gatherings or quiet enjoyment by the water. A standout feature is the brand-new 12x16 shed, ideal for storing canoes, pedal boats and all your outdoor gear, with plenty of room for larger items like lawn equipment or motorcycles and bikes. This move-in-ready property combines comfort, quality updates and serene waterfront living. Just in time for Summer!— The Firm

Key details

  • sold
  • 910 sq ft
  • 11,761 lot sq ft
  • 2 beds
  • 1 baths
  • 1955 built
  • $549 / sq ft
  • $5,974 2025 taxes
MLS #
7⁠3⁠5⁠0⁠9⁠1⁠4⁠4⁠
Last updated
Address
79 Crystal Lake Dr
Town
Carver, MA
ZIP
02330
Sold for
$500,000
Deed (Bk/Pg)
58631 / 63

Map

Neighborhood: Carver

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.