Skip to main content

Listing broker remarks

Set on over 1.2 acres with a 1.62-acre experience via a neighboring easement, this exceptional Chestnut Hill estate offers a tranquil oasis on one of the area’s most coveted and secluded streets. Originally built in 1900 and thoughtfully renovated over time, the residence spans more than 9,300 square feet with six bedrooms, six full bathrooms, and three half bathrooms. Its richly detailed living spaces were designed for both elegant entertaining and everyday comfort. Gracious formal rooms, soaring ceilings, and exquisite millwork overlook beautifully landscaped grounds featuring a heated, in-ground pool, a basketball court, and ample parking. Once home to Alvan T. Fuller, the 50th Governor of Massachusetts, the property carries remarkable historic provenance. The grounds were originally designed by Frederick Law Olmsted, further contributing to the property’s timeless character. This is a rare opportunity to own a historic estate of this scale in an unbeatable location.— MGS Group Real Estate LTD

Key details

  • 9,301 sq ft
  • 1.24 acres
  • 6 beds
  • 7.5 baths
  • 1900 built
  • $881 / sq ft
  • $105,639 2026 taxes
MLS #
7⁠3⁠5⁠2⁠6⁠8⁠5⁠6⁠
Last updated
Address
40 Singletree Rd
Town
Brookline, MA
ZIP
02467
Deed (Bk/Pg)
28858 / 194

Map

Neighborhood: Brookline

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.