Skip to main content

Listing broker remarks

Opportunity knocks! This 3-bedroom, 1-bath front-to-back split offers solid bones and incredible potential for buyers looking to build equity. Key improvements are already in place, including a newer Maytag stainless steel dishwasher (2023), Frigidaire refrigerator (2023), LG front-load washer with Bluetooth (2022), LG gas dryer (2024), water heater (2023), and updated bathroom vanity (2022). Additional features include hardwood flooring, a working fireplace, gas range, and an unfinished lower level ready for future expansion—ideal for a family room, home office, or gym. Exterior highlights include a newly paved driveway (2023) with parking for 4 cars and a 12x16 Reeds Ferry shed (2023) with a 30-year warranty. Conveniently located near Brockton Hospital, shopping, dining, and major routes—perfect for commuters, investors, or owner-occupants looking to add value.— Boom Realty

Key details

  • 1,328 sq ft
  • 8,381 lot sq ft
  • 3 beds
  • 1 baths
  • 1968 built
  • $376 / sq ft
  • $4,775 2025 taxes
MLS #
7⁠3⁠5⁠0⁠1⁠3⁠6⁠8⁠
Last updated
Address
73 Sherman St
Town
Brockton, MA
ZIP
02302
Deed (Bk/Pg)
48408 / 271

Map

Neighborhood: Brockton

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.