Skip to main content

Listing broker remarks

Welcome home to this beautifully updated Cape-style home, ideally situated on a private corner in one of Bridgwater's most desirable neighborhoods. At the heart of the home is a tastefully renovated eat-in kitchen, complete with a center island, breakfast bar, and modern finishes. The dinning room leads you into a bright three-season porch which overlooks a peaceful backyard and composite deck. Ideal for multi-generational living with two first-floor bedrooms, each with its own en-suite bath. Enjoy one-level living, plus a flexible second floor where you have an over sized bedroom, full bath, bonus space, and ample storage. Additional features include a two-car garage, electric vehicle charging outlets and so much more (See Attachment For Full Updates List). A full walkout basement offers great storage and expansion potential. A commuter's dream, located with easy access to Routes 24, 104, and 495. This home combines comfort, flexibility, and modern updates in a desirable setting.— Keller Williams Realty

Key details

  • 2,540 sq ft
  • 14,080 lot sq ft
  • 3 beds
  • 3.5 baths
  • 1953 built
  • $283 / sq ft
  • $7,516 2025 taxes
MLS #
7⁠3⁠5⁠1⁠8⁠3⁠6⁠4⁠
Last updated
Address
92 Norlen Park
Town
Bridgewater, MA
ZIP
02324
Deed (Bk/Pg)
59602 / 94-95

Map

Neighborhood: Bridgewater

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.