Skip to main content

Listing broker remarks

This well-maintained single-level ranch offers a convenient location & many updates throughout. The spacious living room with hardwood floors offers access to the sunroom, deck & large backyard, perfect for entertaining or relaxing. The granite kitchen with stainless steel appliances opens to a warm, functional layout perfect for everyday living. Featuring 3 bedrooms with hardwood floors under the carpeting, this home blends classic charm with practical improvements already completed. A beautiful bathroom updated in 2025 adds a modern touch, while the finished lower level provides extra living space with endless options. Recent updates include a brand new septic system, upgraded 200 amp electrical service (2021), generator hookup (2021), oil tank (2023), central AC (2023). Showings begin at first open house weekend on May 16th & 17th from 1-3. All offers will be presented together on May 21st.— Conway - Lakeville

Key details

  • 1,184 sq ft
  • 20,250 lot sq ft
  • 3 beds
  • 1 baths
  • 1961 built
  • $430 / sq ft
  • $5,263 2025 taxes
MLS #
7⁠3⁠5⁠1⁠6⁠3⁠9⁠3⁠
Last updated
Address
313 Plain St.
Town
Bridgewater, MA
ZIP
02324
Deed (Bk/Pg)
2888 / 175

Map

Neighborhood: Bridgewater

National Historic Landmark

Federally designated as nationally significant — the highest U.S. historic recognition. Section 106 review applies to federal undertakings affecting the property.

National Register

Listed on the National Register of Historic Places. Owners may qualify for the 20% federal Historic Rehabilitation Tax Credit on certified rehabilitation work.

State Register

Listed on the Massachusetts State Register of Historic Places.

Local Historic District

Inside a Local Historic District. Exterior changes visible from a public way require approval from the local historic district commission.

Local Landmark

Individually designated by the town as a local landmark. Exterior alterations require commission approval.

MACRIS Inventory

Documented in MACRIS, the state historic inventory. Informational only — no regulatory constraints.

Article 85 (Boston)

Subject to Boston Article 85 demolition-delay review, which can pause demolition of buildings 50+ years old for up to 90 days.